EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
report [2015/06/23 16:12] – [8.1 Discussion] team2report [2015/06/25 13:00] (current) – [7.2.2 Control System Architecture] team2
Line 133: Line 133:
 ==== 1.9 Report Structure ==== ==== 1.9 Report Structure ====
  
-1Introduction+The following list shows the structure of this report including a short description of each chapter.
  
-2State of the Art+1Introduction - Presentation of the team, motivation, project and main problems
  
-3Project Management+2State of the Art - Specification of products and technologies that are already available in the market
  
-4Marketing Plan+3Project Management - Organisation and management of the project including timetables and task allocation
  
-5Eco-efficiency Measures for Sustainability+4Marketing Plan Analysis and strategies concerning relevant the business environment
  
-6Ethical and Deontological Concerns+5Eco-efficiency Measures for Sustainability - Enhancement of sustainability and Life-cycle analysis
  
-7Project Development+6Ethical and Deontological Concerns - Legitimacy and legality analysis
  
-8. Conclusions+7. Project Development - Explanation of Design, Construction and Electrical Hardware used in the 'Ecodome' 
 + 
 +8. Conclusions - Discussion about the project and possible future developments
 ===== 2. State of the Art ===== ===== 2. State of the Art =====
  
Line 1315: Line 1317:
 <WRAP centeralign> <WRAP centeralign>
 <figure flabel37> <figure flabel37>
-{{::flowchart.jpg?nolink&400|}}+{{::flowchart_1_.jpg?nolink&500|}}
 <caption>Flowchart of our program</caption> <caption>Flowchart of our program</caption>
 </figure> </figure>
QR Code
QR Code report (generated for current page)